Hawthorn Football Club Water Harvesting Project

In collaboration with Storm Consulting, Contek Constructions successfully constructed a 1.6 MegaLitre storm water harvesting system. The treated water can be remotely controlled and utilised for ground irrigation at Waverly Park. A number of safe guards have been installed and commissioned by Contek ensuring notification if contaminates enter the system.

Main Scope:

• Earthwork
• Tree removal
• Bio-infiltration basin
• Rocla CDS GPT& diversion pit
• Sedimentation basin
• Undergrouns tank
• Diversion pipes
• Pump & irrigation system
• External filtration devices
• Rocla CDS GPT
• UV disinfection unit
• PH/EC sensor

Client: Hawthorn Football Club & Storm Consulting
Contract value: $1 mil
Completion: 2014