O’Shannessy Aqueduct Trail, Warburton

Contek Constructions was engaged to construct a raised boardwalk, walking trail and bridge through the environmentally sensitive Otways National Park. The boardwalk was built to be durable, constructed from steel with concrete piles and footings, timber subframe and Carbonloc decking.


As always, Contek applied best practices to minimise harm to the environment.

Main Scope:

• Construction of foot and bicycle trail
• Construction of raised boardwalk
• Construction of foot bridge

Client: Parks Victoria
Contract value: ~$300 000
Completion: 2012